the Context



Highway tunnel

After numerous cost overruns and delays, a 1.8 mi highway tunnel in Seattle, Washington, U.S., opens to traffic, becoming the largest road tunnel in the contiguous United States. It was bored using Bertha, the world's largest tunnel boring machine.

  1. Washington Post

Related: